PROJECTS
EREDA develops the energy assessment of a 50 MW wind farm in the western area of Bosnia-Herzegovina. Using the measurements recorded in the site, EREDA has designed the layout, energy assessment and class and sub-class assessment of a wind farm … Continue reading
EREDA has conducted the due diligence of a 20 MW wind farm located in Spain and in operation since 2012. The wind turbine technology was 128 Gamesa. This assessment included the analysis of the technological platform, the analysis of the … Continue reading
Monitoring of Reliability Tests in a wind farm in Pakistan during the commissioning of 33 1500 KW Goldwind GW77 wind turbines.
General inspection of 23 wind turbines with a total power of 27,61 MW. All the wind turbines are from the same manufacturer but different models. The aim of these works was to improve the AEP of the wind turbines.
EREDA provided technical support and supervision of repairing works on the incident occurred in a 2 x 80 MVA substation in Romania.