Works of inspection, performance analysis and contractual parameters of a wind farm with 50 MW of installed capacity before the End of Warranty. The Wind Farm has 25 wind turbines G97 (GAMESA) of 2 MW each one. The works include general … Continue reading
Technical support to an important manufacturer of wind turbines for the definition of data analysis and wind turbine inspection before the installation of a software and a hardware that improve the wind turbines productions.
Technical due dilligence for 12 2.5 MW wind turbines that includes the review of the contracts, performance analysis and physical inspection of the facilities in Spain.
Estimation of the lost profits of a 380 MW wind farm in a 6 month period analyzing meteorological mast data, virtual masts and crossing wind and production data.
Wind energy assessment of a 256 MW wind farm, the biggest one in Mexico.