PROJECTS
Ereda has performed the design civil works in stage I (6 MW) and stage II (9 MW) for a wind farm in Romania. In addition Ereda also has supervised the construction of the stage I and the switching center of … Continue reading
Technical and commercial management of a Wind Farm in Romania.
General inspection of Nordex N90 wind turbine.
Ereda prepared a guide to change the wind turbine gearbox and blade bearing.
Inspection to verify the main bearing of a Fuhrlander FL2500 wind turbine.