EREDA HAS BEEN AWARDED WITH THE ENGINEERING AND CONSTRUCTION CONTRACT OF THE ELECTRICAL INFRASTRUCTURE NECESSARY TO THE ENLARGEMENT OF THE TEST BANK WÄRTSILÄ

EREDA has been awarded with a engineering and construction turnkey contract for the electrical infrastructure necessary to connect to the network the extension of the test bank that the Finnish multinational Wärtsilä has in the town of Bermeo (Vizcaya).
This new contract is a continuation of consultancy work in the field of electrical infrastructure, that EREDA has been developing for Wärtsilä since 2012.