EREDA did the performance monitoring (availability report, power curve, reactive power) and wind turbine monitoring making monthly reports of 6 Wind Farms in Spain with a total capacity of 69.5 MW. The client of this project was EOLIA. EREDA also had … Continue reading
EREDA performes the resource assessment and improvement of Atlantic Complex wind farm (120 MW) and Arambaré (240 MW) is performed.
Study for the conceptual design, engineering and technical specifications for a large-scale (30 MW) hybrid system to electrify Baia dos Tigres island in the angolan province of Namibe. The study includes the characterisation of loads and available resources (wind and … Continue reading
This wind farm is located in the spanish province of Guadalajara. It comprises 32 G90 wind turbines. Site consultancy and project management covered civil works, medium voltage electric infrastructure and the construction of a 30/132-kv substation and its masonry enclosure.