EREDA has been nominated for the WEC assembly supervisión in Miñon Wind Farm in Galicia

Miñon Wind Farm is located in Vimianzo (La Coruña, Spain). Elecnor is the turnkey EPC contractor. WTG supply and assembly is in charge of Enercon. The owner is Greenalia Power. EREDA will provide the supply supervisión as well as final inspection and commissioning verification. Miñon Wind Farm consists of 6 Enercon E-126 EP3 wind turbines.

IMG_3521