Works of inspection, performance analysis and contractual parameters of a wind farm with 50 MW of installed capacity before the End of Warranty. The Wind Farm has 25 wind turbines G97 (GAMESA) of 2 MW each one. The works include general inspections of wind turbines, blades, transformers, gearboxes and substation.
LAST PROJECTS