Civil works and monitoring of the construction of a wind farm in Romania

Ereda has performed the design civil works in stage I (6 MW) and stage II (9 MW) for a wind farm in Romania. In addition Ereda also has supervised the construction of the stage I and the switching center of the wind farm.